Commit graph

2 commits

Author SHA1 Message Date
Francisco Solla
87ab9a2b1d docs(ops131): registra a decisão A e o runbook do cutover
Some checks failed
Deploy / preflight (push) Has been cancelled
Deploy / deploy staging (teqo-staging) (push) Has been cancelled
Deploy / requeue when main advanced (push) Has been cancelled
Deploy / deploy production (teqo-1313) (push) Has been cancelled
Deploy / verify (push) Has been cancelled
Decisão A (site público + /campanha no domínio novo, passkeys re-registradas uma vez) refletida no plano; runbook de cutover/rollback no docs/ops/teqo-1313-deploy.md com pré-flight, ingress/DNS, env, verificação e janela read-only do WordPress; changelog da entrega.
2026-11-08 20:30:49 -03:00
Francisco Solla
8fa6432b7b docs(plans): planeja o site pós-eleição, o PL 5594/2026 e o cutover de domínio
Some checks are pending
Deploy / preflight (push) Waiting to run
Deploy / verify (push) Blocked by required conditions
Deploy / deploy staging (teqo-staging) (push) Blocked by required conditions
Deploy / requeue when main advanced (push) Blocked by required conditions
Deploy / deploy production (teqo-1313) (push) Blocked by required conditions
S47 (#1442), S48 (#1443), OPS130 (#1444) e OPS131 (#1445). Inclui o design hi-fi do S47 e a regra pós-eleição no DESIGN.md.
2026-10-21 22:59:32 -03:00