Commit graph

6 commits

Author SHA1 Message Date
Francisco Ignácio Fontoura Solla
e468f4192e Sync roadmap and intel plans with the 2026-07-23 field session; add E4R/A11/E16/E17 plans 2026-07-24 02:54:28 -03:00
Francisco Ignácio Fontoura Solla
adc0f31f5b Sync all project docs with the deployed remodel and hardening; compile roadmap
- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
  tables and the delivered map/list item paragraphs compressed into 'Já entregue';
  janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
  original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
  builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
  every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
  Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
  as historical, access/* structure note, election-aggregates artifact +
  election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
  intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
  satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
  (now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
  shared pending shell, petition generateStaticParams select/depth; ledger the
  surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
  remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
  UI rules updated to current component names.
2026-07-24 02:04:45 -03:00
Francisco Ignácio Fontoura Solla
0460b08429 Add allowlisted global cache revalidation for Onda 0 F1.
Extend POST /api/revalidate with posts and global_privacy-policy tags so
direct-DB Onda 0 writes can bust /privacidade without an admin edit.
2026-07-19 22:21:16 -03:00
Francisco Ignácio Fontoura Solla
14cfcdb3f6 Restore full roadmap detail and align project documentation.
Expand the compiled next-steps doc back into the full delivery history, cross-reference plan statuses, and sync AGENTS.md, PRODUCT.md, and the Núcleos project notebook.
2026-07-19 16:19:36 -03:00
Francisco Ignácio Fontoura Solla
71421c725c Compile the roadmap into next-steps docs and align project references.
Replace the delivery diary with open items and windows, and sync AGENTS, notebook, README, and plan pointers with provisional Onda 0 Consent hold.
2026-07-19 16:13:47 -03:00
Francisco Ignácio Fontoura Solla
cc66ec3c31 Deliver Onda 0 MVP: provisional Consent, privacy policy, and /privacidade.
Auto-provision legal texts via migrations and db:seed:consent so local and
production deploy stay fail-closed-ready; register O0+ simplify follow-ups.
2026-07-19 03:38:21 -03:00