- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
tables and the delivered map/list item paragraphs compressed into 'Já entregue';
janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
as historical, access/* structure note, election-aggregates artifact +
election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
(now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
shared pending shell, petition generateStaticParams select/depth; ledger the
surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
UI rules updated to current component names.
Expand the compiled next-steps doc back into the full delivery history, cross-reference plan statuses, and sync AGENTS.md, PRODUCT.md, and the Núcleos project notebook.