Commit graph

5 commits

Author SHA1 Message Date
Francisco Ignácio Fontoura Solla
a7feb6b26e Register the E13 review debts on the roadmap.
The one finding the /simplify skipped for the wrong reason becomes a fill-in:
the tour composer signals a território change only on the control, and the
pending pieces it dismissed as list-coupled are a Provider, a div and a hook
with a local fallback. The batched goal-account loader stays a trigger on the
E13 plan — the planner and the list diverge on missing data on purpose.
2026-07-27 21:12:05 -03:00
Francisco Ignácio Fontoura Solla
d5b4af2d98 E13: visit eligibility checklist and the tour composer.
Five conditions per município (volume, headroom, rede, janela, encaixe) with
their reason always visible, plus a staff-only composer at
/campanha/atividades/giros that turns an âncora + satélites + semente into draft
activities in one transaction. No `visita` kind and no `tour` entity:
`deputyPresent` already marks the candidate's own agenda.
2026-07-27 21:04:04 -03:00
Francisco Ignácio Fontoura Solla
e468f4192e Sync roadmap and intel plans with the 2026-07-23 field session; add E4R/A11/E16/E17 plans 2026-07-24 02:54:28 -03:00
Francisco Ignácio Fontoura Solla
adc0f31f5b Sync all project docs with the deployed remodel and hardening; compile roadmap
- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
  tables and the delivered map/list item paragraphs compressed into 'Já entregue';
  janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
  original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
  builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
  every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
  Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
  as historical, access/* structure note, election-aggregates artifact +
  election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
  intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
  satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
  (now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
  shared pending shell, petition generateStaticParams select/depth; ledger the
  surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
  remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
  UI rules updated to current component names.
2026-07-24 02:04:45 -03:00
Francisco Ignácio Fontoura Solla
a5ab2c238c Register campaign intelligence discovery and E8–E15 roadmap program.
Embeds approved literature→persona→interview research in docs/research/, adds inteligencia-campanha master plan with child specs, updates roadmap/PRODUCT/AGENTS, and extends roadmap skills with data-presentation guidance.
2026-07-22 00:04:50 -03:00