Commit graph

2 commits

Author SHA1 Message Date
Francisco Ignácio Fontoura Solla
adc0f31f5b Sync all project docs with the deployed remodel and hardening; compile roadmap
- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
  tables and the delivered map/list item paragraphs compressed into 'Já entregue';
  janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
  original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
  builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
  every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
  Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
  as historical, access/* structure note, election-aggregates artifact +
  election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
  intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
  satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
  (now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
  shared pending shell, petition generateStaticParams select/depth; ledger the
  surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
  remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
  UI rules updated to current component names.
2026-07-24 02:04:45 -03:00
Francisco Ignácio Fontoura Solla
cf13c441aa Remodel /campanha around predefined Praças replacing electoral nuclei.
436 seeded Praças (municipality-based; per-TSE-zone in Salvador/Camaçari) become
the operational unit; roles renamed to coordinator/advisor/leader with advisors
scoped to administered Praças. Leadership is one record per person across many
Praças/organizations; vote pledges split leader-declared vs staff-estimated
(estimates never serialized to leaders). Adds organizations, demand workflow
with staff-only cost/receipts, action-plan results with deputy presence, manual
political trend, multi-candidate comparison and the diverging red/white/blue
map mode. Migration 20260721_020109_remodel_plazas deliberately resets the
campaign vertical in production (public site untouched); test suite ported to
the new model (unit 187 / int 306 / e2e 9 green).
2026-07-21 02:28:00 -03:00