Commit graph

6 commits

Author SHA1 Message Date
Francisco Ignácio Fontoura Solla
adc0f31f5b Sync all project docs with the deployed remodel and hardening; compile roadmap
- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
  tables and the delivered map/list item paragraphs compressed into 'Já entregue';
  janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
  original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
  builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
  every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
  Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
  as historical, access/* structure note, election-aggregates artifact +
  election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
  intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
  satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
  (now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
  shared pending shell, petition generateStaticParams select/depth; ledger the
  surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
  remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
  UI rules updated to current component names.
2026-07-24 02:04:45 -03:00
Francisco Ignácio Fontoura Solla
c0bf440c76 Deliver C8 F4 shared plaza staff form actions and close simplify debts.
Unify list and /editar server actions in plazaStaffFormActions.ts so B9 inline edits and the edit page share one implementation without behavior changes.
2026-07-21 16:14:30 -03:00
Francisco Ignácio Fontoura Solla
0dcef662e7 Deliver A9+ shared Praças list loader and scoped revalidation.
Deduplicate pledge aggregation via loadPlazaListPageBundle, add plazaRevalidation with slug-scoped detail paths after inline saves, and document the fill-in as shipped.
2026-07-21 13:22:12 -03:00
Francisco Ignácio Fontoura Solla
70c61ab49e Deliver B9 quick edit on Praças list and register simplify follow-ups.
Inline staff edits for advisors, political trend, and expected votes on /campanha/pracas; absorb post-simplify debts into A9+ and C8 plans.
2026-07-21 11:45:37 -03:00
Francisco Ignácio Fontoura Solla
1e23b27b4f Deliver C8 scale/DRY for supporters and register C9 follow-ups.
Bulk import and list paths get single-round-trip locks, drizzle returning reads, pg_trgm search, shared drizzleBulk helpers, and consolidated campaign formActions; simplify debts land as C9 in the roadmap.
2026-07-19 00:31:06 -03:00
Francisco Ignácio Fontoura Solla
9ccfb3b704 Simplify C6 supporter paths and register C8 scale/DRY follow-ups.
Apply the /simplify cleanup to the C6 commit (identity maps, dead branches,
relationshipId reuse, native base64url, rowCount fix, canManageCampaignUsers
reuse) and register the unimplemented debits as roadmap item C8 with its plan.
2026-07-18 22:34:55 -03:00