Commit graph

8 commits

Author SHA1 Message Date
Francisco Ignácio Fontoura Solla
adc0f31f5b Sync all project docs with the deployed remodel and hardening; compile roadmap
- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
  tables and the delivered map/list item paragraphs compressed into 'Já entregue';
  janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
  original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
  builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
  every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
  Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
  as historical, access/* structure note, election-aggregates artifact +
  election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
  intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
  satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
  (now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
  shared pending shell, petition generateStaticParams select/depth; ledger the
  surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
  remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
  UI rules updated to current component names.
2026-07-24 02:04:45 -03:00
Francisco Ignácio Fontoura Solla
14cfcdb3f6 Restore full roadmap detail and align project documentation.
Expand the compiled next-steps doc back into the full delivery history, cross-reference plan statuses, and sync AGENTS.md, PRODUCT.md, and the Núcleos project notebook.
2026-07-19 16:19:36 -03:00
Francisco Ignácio Fontoura Solla
71421c725c Compile the roadmap into next-steps docs and align project references.
Replace the delivery diary with open items and windows, and sync AGENTS, notebook, README, and plan pointers with provisional Onda 0 Consent hold.
2026-07-19 16:13:47 -03:00
Francisco Ignácio Fontoura Solla
b2856abceb Fix Vercel build failing on sync exports from supporter server actions.
Next.js requires every export from a 'use server' module to be async; move the import type guard into a shared util and mark createSupporterRecord async. Also mark C2 as merged in the roadmap/docs.
2026-07-18 21:17:58 -03:00
Francisco Ignácio Fontoura Solla
a18e2f15f5 Simplify C2 supporter paths and register C6 scale follow-ups.
Tighten import/create view models after review, and capture the deferred DRY/import-scale work as roadmap item C6.
2026-07-18 20:33:50 -03:00
Francisco Ignácio Fontoura Solla
b079daa9bb Add C2 nominal supporter registry for /campanha.
Ship the supporter join collection, consent-keyed create/import/remove actions, and apoiadores UI so staff can build a phone-required nominal base before mass field ops.
2026-07-18 20:32:54 -03:00
Francisco Ignácio Fontoura Solla
b0c86cf8e3 Version UX Pilot design refs and map them to roadmap plans
Add the 11 UX Pilot design pairs (.png + .html) under
docs/design-refs/latest/ and link each to its roadmap item and plan.
Record the decision that UX/structure is the reference but the old
palette is not — implementation uses the light campaign theme tokens.
2026-07-18 16:36:09 -03:00
Francisco Ignácio Fontoura Solla
bcac665cb5 Ship /campanha nuclei MVP with RBAC, invites, and vote estimates.
Adds electoral nuclei, leaderships, updates, and WhatsApp invite flows behind campaign auth, plus the consolidated schema migration that Vercel applies on deploy.
2026-07-18 15:01:56 -03:00