Commit graph

4 commits

Author SHA1 Message Date
Francisco Ignácio Fontoura Solla
63fe4431bf E10: classificacao territorial relativa (Reduto/Expansao/Manutencao/Marginal/Sem base) sobre o artefato TSE, com coluna+sort+filtro na lista, badge no card da conta da cadeira e na capa do dossie; seam generico cellTooltip na CampaignTable e promocao do CampaignHoverTooltip para shared 2026-07-25 21:59:20 -03:00
Francisco Ignácio Fontoura Solla
0c1127b35a Pass 2 W4a: electionInsights.ts deletado (941 linhas, 71 exports, 2 vivos)
- formatElectionNumber -> src/lib/electionFormat.ts (13 importers); computeVoteTrend + tipos -> src/lib/voteTrend.ts
- ~52 exports sem consumidor deletados (limiares 35/20/10 da era nucleos, gap vs 2022, conversao, mobilizacao, ticket flip/leverage) - decisao D2; formulas no git history; E10 nasce em modulo novo (nota no plano classificacao-territorial-relativa.md)
- specs: voteTrend.unit.spec.ts (pins vivos + pin do defeito E18 de fracao), electionPartySpectrum.unit.spec.ts sem os blocos de ticket; electionInsights.unit.spec.ts deletado
- fix de regressao W2 pega pelo knip: scripts/import-projecao.mjs importava voteEstimate/slug nos paths antigos (knip agora roda sem pipe mascarando exit code)
- knip unused exports: 157 -> 140
2026-07-25 14:57:49 -03:00
Francisco Ignácio Fontoura Solla
adc0f31f5b Sync all project docs with the deployed remodel and hardening; compile roadmap
- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
  tables and the delivered map/list item paragraphs compressed into 'Já entregue';
  janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
  original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
  builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
  every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
  Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
  as historical, access/* structure note, election-aggregates artifact +
  election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
  intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
  satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
  (now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
  shared pending shell, petition generateStaticParams select/depth; ledger the
  surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
  remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
  UI rules updated to current component names.
2026-07-24 02:04:45 -03:00
Francisco Ignácio Fontoura Solla
a5ab2c238c Register campaign intelligence discovery and E8–E15 roadmap program.
Embeds approved literature→persona→interview research in docs/research/, adds inteligencia-campanha master plan with child specs, updates roadmap/PRODUCT/AGENTS, and extends roadmap skills with data-presentation guidance.
2026-07-22 00:04:50 -03:00