Commit graph

10 commits

Author SHA1 Message Date
Francisco Ignácio Fontoura Solla
e8a440b837 Pass 2 W5: close-out de documentacao
- AGENTS.md: Known Gap #2 resolvido (D3), arvore de estrutura (+AllocationDecision, PrivacyPolicy, CampaignGoals; components por dominio), URLs novas (/campanha/assessores|conceitos|perfil), entrada 'Recently resolved' do Pass 2
- tracker: todos os workstreams done; secao de achados de drift de docs de produto (PRODUCT/DESIGN/CUSTOMER - reportados, nao aplicados)
- TESTING.md: 46/48/7 + linhas do safety net (formActions wrapper, voteTrend, submitWhatsapp)
- TECH-DEBT: smells fechados (municipalityUi split, detail RSCs, formActions, components subpastas, electionInsights)
- planos: status entregue nos 5 do Pass 2; escala-dry-pos-b16 absorvido; C8 F3/F4 fechados em escala-dry-pos-c6; notas de costura em B17/B18/cenario-junto; nota de conflito E4R em mapa-projecao
- roadmap: entrada Pass 2 no 'Ja entregue', B17/B18 marcados como triviais, B16+ riscado, header atualizado
- notebook do projeto: entrada Pass 2
- DESIGN.md: secao do sistema de listas (unico drift aplicado, conforme plano)
2026-07-25 16:08:38 -03:00
Francisco Ignácio Fontoura Solla
d14ed67801 Ship E4R: always-overwrite seed of projection spreadsheet into voteGoals and priority.
One-shot CLI (`pnpm db:seed:projecao`) matches MAPA GERAL to municipalities, skips Salvador, and re-seeds when a newer sheet arrives; dry-run + docs/roadmap updated.
2026-07-24 13:13:46 -03:00
Francisco Ignácio Fontoura Solla
e468f4192e Sync roadmap and intel plans with the 2026-07-23 field session; add E4R/A11/E16/E17 plans 2026-07-24 02:54:28 -03:00
Francisco Ignácio Fontoura Solla
387cd46fd3 Mark E4 spreadsheet import as cut in roadmap and project docs.
Product decision: strategic nucleus data will be entered manually via E1+E3 UI instead of a one-shot pnpm db:seed:mapa import.
2026-07-19 22:06:25 -03:00
Francisco Ignácio Fontoura Solla
14cfcdb3f6 Restore full roadmap detail and align project documentation.
Expand the compiled next-steps doc back into the full delivery history, cross-reference plan statuses, and sync AGENTS.md, PRODUCT.md, and the Núcleos project notebook.
2026-07-19 16:19:36 -03:00
Francisco Ignácio Fontoura Solla
71421c725c Compile the roadmap into next-steps docs and align project references.
Replace the delivery diary with open items and windows, and sync AGENTS, notebook, README, and plan pointers with provisional Onda 0 Consent hold.
2026-07-19 16:13:47 -03:00
Francisco Ignácio Fontoura Solla
8b4ae2bf36 Mark E1+E3 as delivered in roadmap and project docs.
Sync Trilha E status after the nucleus goals/strategy fields shipped in main.
2026-07-19 12:06:47 -03:00
Francisco Ignácio Fontoura Solla
b0f4ebc1ed Add E2 TSE 2014/2018 vote series and historical trend insights.
Extends the electoral baseline with multi-year seeding, computeVoteTrend, list/detail UI, and registers post-simplify follow-ups as E7.
2026-07-19 05:09:43 -03:00
Francisco Ignácio Fontoura Solla
e5e051d175 Deliver E1 vote goals and E3 strategy fields on nuclei.
Wire schema, UI, aggregates, and tests for scenario goals, priority filter, staff-only dobradinha notes and next steps; register E6 scale follow-ups from simplify.
2026-07-19 04:38:07 -03:00
Francisco Ignácio Fontoura Solla
39f7edb10f Register Trilha E plan to match and exceed the 2026 vote projection spreadsheets.
Adds mapa-projecao-municipios.md (E1–E5), updates the roadmap graph and execution windows, and records the product decisions in the nuclei notebook.
2026-07-19 00:28:47 -03:00