Commit graph

4 commits

Author SHA1 Message Date
Francisco Ignácio Fontoura Solla
8d6c8e3313 Move the level control onto B42's shared cell-edit overlay.
B42 landed on main during this session and extracted `CampaignCellEditOverlay`
— Popover on `md+`, Drawer below it, where a popover fights the virtual
keyboard. The rebase auto-merged E14's "Nível" block into what had become the
Drawer, which compiles and would have opened a popover inside a sheet, so the
control now takes `variant` like its three siblings. The container's Popover
branch is point for point what E14 had hand-written, so the desktop is
unchanged; on touch, where there is no hover to carry it, the trigger now
spells the level out instead of showing the bare numeral.
2026-07-27 21:24:45 -03:00
Francisco Ignácio Fontoura Solla
c7001b75f0 E14: engagement levels N0-N4 and the first allocationDecision writer.
`municipality.engagementLevel` (staff-only, no default) records what the
campaign decided to invest in a município, next to the E8/E10 metrics that
describe what it knows. Moving it is a reallocation decision, so only
unrestricted staff may, every move carries a rationale plus the signals that
would reverse it, and the write files an `allocationDecision` in the same
transaction under an advisory lock taken before the current level is read —
otherwise the snapshot's `from` is a guess. The enum gains `movimento`: a level
move is neither `aceita` nor `descarta`.

No backfill. Null is "Sem nível", and filtering by it is the triage queue.
That is also why the list sorts `nivel` in memory rather than in the query:
Postgres puts NULLs first on DESC, so a native sort would open "N4 primeiro"
on a page of municípios nobody has decided about yet. The filter stays native.

The hysteresis rules from research §6.8 are pure and client-safe, so the
Popover explains a block before submitting and the server re-runs them anyway;
a blocked move answers 409 with typed violations and the override is recorded
with exactly the rules it contradicted.
2026-07-27 21:19:33 -03:00
Francisco Ignácio Fontoura Solla
adc0f31f5b Sync all project docs with the deployed remodel and hardening; compile roadmap
- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
  tables and the delivered map/list item paragraphs compressed into 'Já entregue';
  janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
  original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
  builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
  every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
  Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
  as historical, access/* structure note, election-aggregates artifact +
  election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
  intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
  satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
  (now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
  shared pending shell, petition generateStaticParams select/depth; ledger the
  surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
  remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
  UI rules updated to current component names.
2026-07-24 02:04:45 -03:00
Francisco Ignácio Fontoura Solla
a5ab2c238c Register campaign intelligence discovery and E8–E15 roadmap program.
Embeds approved literature→persona→interview research in docs/research/, adds inteligencia-campanha master plan with child specs, updates roadmap/PRODUCT/AGENTS, and extends roadmap skills with data-presentation guidance.
2026-07-22 00:04:50 -03:00