teqo-backup/docs
Francisco Ignácio Fontoura Solla 0dcef662e7 Deliver A9+ shared Praças list loader and scoped revalidation.
Deduplicate pledge aggregation via loadPlazaListPageBundle, add plazaRevalidation with slug-scoped detail paths after inline saves, and document the fill-in as shipped.
2026-07-21 13:22:12 -03:00
..
design-refs Version UX Pilot design refs and map them to roadmap plans 2026-07-18 16:36:09 -03:00
plans Deliver A9+ shared Praças list loader and scoped revalidation. 2026-07-21 13:22:12 -03:00
IMPROVE-APP-PLAN.md Refactor campaign dashboard UX and add product discovery artifacts. 2026-07-19 21:56:01 -03:00
roadmap.md Deliver A9+ shared Praças list loader and scoped revalidation. 2026-07-21 13:22:12 -03:00