teqo-backup/docs
Francisco Ignácio Fontoura Solla 2e0cc2c03e chore(ci): parallel PR jobs, affected tests, push gate, owner-of-red-CI policy
- ci-pr.yml: split the serial checks job into parallel lint/format/
  typecheck/knip/cycles + unit/int (vitest --changed vs PR base via
  scripts/test-affected.mjs, full fallback on high-risk paths) + e2e
  (manifest path->spec via scripts/e2e-affected.mjs, blocking) + build;
  migration-lock gains checkout + pull-requests:read (fixes the failures
  that blocked PR #50)
- ci.yml (main): full safety net — seed:minimal + int full + build + e2e
- package.json: gate:fast / gate:push; .husky/pre-push runs gate:push
- docs: "Dono do PR, dono do CI" policy in AGENT-OPS + work-issue +
  engineering-standards; changelog entry; plans for OPS3-OPS7
2026-07-30 17:37:20 -03:00
..
design-refs Version UX Pilot design refs and map them to roadmap plans 2026-07-18 16:36:09 -03:00
plans chore(ci): parallel PR jobs, affected tests, push gate, owner-of-red-CI policy 2026-07-30 17:37:20 -03:00
research Add emendas parliamentary-amendments discovery cycle (ciclo 3): 4-axis compendium, four synthetic personas, two-round interviews with cross-examination, consolidated report (kernel, 12 ranked pains, OST mapped to /mandato-/campanha-/comunicacao, anti-goals, 14 bets), and the real-interview script for the gabinete's planilha keeper. 2026-07-28 18:05:35 -03:00
AGENT-OPS.md chore(ci): parallel PR jobs, affected tests, push gate, owner-of-red-CI policy 2026-07-30 17:37:20 -03:00
ARCHITECTURE.md Engineering Pass 3: consolidate patterns and lock them with guards. 2026-07-29 06:11:29 -03:00
CHANGELOG-AGENTS.md chore(ci): parallel PR jobs, affected tests, push gate, owner-of-red-CI policy 2026-07-30 17:37:20 -03:00
IMPROVE-APP-PLAN.md Document CG observed-use session and draft action-first home flows. 2026-07-29 13:14:57 -03:00
IMPROVE-CODE-QUALITY-PLAN.md chore: delete legacy skills 2026-07-30 12:22:06 -03:00
PAYLOAD-REFERENCE.md chore: format docs 2026-07-30 05:22:58 -03:00
roadmap.md feat: convert roadmap items to issues + model properties 2026-07-30 12:22:05 -03:00
TECH-DEBT.md chore: format seed and workflow files 2026-07-30 04:45:44 -03:00
TESTING.md chore(ci): parallel PR jobs, affected tests, push gate, owner-of-red-CI policy 2026-07-30 17:37:20 -03:00