mirror of
https://github.com/fsolla/teqo.git
synced 2026-11-23 06:33:06 +00:00
- ci-pr.yml: split the serial checks job into parallel lint/format/ typecheck/knip/cycles + unit/int (vitest --changed vs PR base via scripts/test-affected.mjs, full fallback on high-risk paths) + e2e (manifest path->spec via scripts/e2e-affected.mjs, blocking) + build; migration-lock gains checkout + pull-requests:read (fixes the failures that blocked PR #50) - ci.yml (main): full safety net — seed:minimal + int full + build + e2e - package.json: gate:fast / gate:push; .husky/pre-push runs gate:push - docs: "Dono do PR, dono do CI" policy in AGENT-OPS + work-issue + engineering-standards; changelog entry; plans for OPS3-OPS7
3 lines
175 B
Text
Executable file
3 lines
175 B
Text
Executable file
# Fast gate before push (source of truth: package.json `gate:push`).
|
|
# Full gate = CI do PR (docs/AGENT-OPS.md). Escape hatch para WIP: `git push --no-verify`.
|
|
pnpm gate:push
|