Meta Bom/Regular/Mínimo duplicated the estimate scenarios — keep a single municipality series (pessimista/média/otimista), backfill then drop the old columns, and map the spreadsheet onto expectedVotes.
- Compile docs/roadmap.md into a next-steps document (277→206 lines): R0–R5/M1–M5
tables and the delivered map/list item paragraphs compressed into 'Já entregue';
janelas, grafo and cortes list only open IDs; C10/C11/C8 fill-ins keep their
original triggers; C5 moved under 'A validar'.
- Record the production deploy of the destructive remodel chain (2026-07-23 Vercel
builds) across roadmap, AGENTS.md, the project notebook and plans — supersedes
every 'deploy pendente'; smoke pós-deploy + onboarding remain the open blockers.
- Fix AGENTS.md internal contradictions: Município locked-decisions bullet (435,
Camaçari whole, candidate role), campaignUser role enum, deploy-checklist item 7
as historical, access/* structure note, election-aggregates artifact +
election-tse revalidate runbook.
- Sync open plans to real identifiers (plaza*/nucleus* → municipality*): the
intelligence program (master + E8–E15/B13/C12 with artifact/caching context and
satisfied deps), B8 rescoped to Salvador ZE 1–19 only, WhatsApp D3–D5, D2, A6
(now the insight layer over stateDeputy), RS+, onda-0 smoke step.
- Close items verified done in code: C8 F4 (DRY de forms) complete, filtros-auto
shared pending shell, petition generateStaticParams select/depth; ledger the
surviving user-visible 'Praça' copy in src as new P2 debt.
- Banner delivered praça-era plans (production note + rename pointer); mark
remodelagem-pracas.md superseded and remodelagem-municipios.md delivered.
- TECH-DEBT smell statuses, TESTING RBAC row, README quality gates, campanha
UI rules updated to current component names.
- .cursor/rules/engineering-standards.mdc (always applied): dead code dies
immediately (knip after every change), zero-warning gate, as-never ban with
the typed escape hatches, server-first composition and the client-safe
contract-module pattern, the caching ladder (React cache → unstable_cache +
tag → committed artifact), explicit collection access, lib vs utilities
convention, rule-of-three for abstractions
- AGENTS.md: hardening entry with pointers to the tracker/ledger/testing map;
drift fixed (TopoJSON decode is lazy, collections list post-remodel,
election-tse in the revalidate allowlist, knip in the verification
checklist); Known Gap #1 rewritten for the shipped access lockdown
- docs/roadmap.md: admin access item updated; engineering-debt section points
at TECH-DEBT.md
- tracker phases updated; removed two stale pre-rename file copies
Rename the operational unit "Praça"/"Núcleo" to "Município" (code identifier
`municipality`) and land the 2026-07-23 course changes:
- New `candidate` role with unrestricted visibility (`isCampaignStaff` now
includes it) alongside coordinator/advisor; leader is locked down to the
supporter contact tool only.
- Demandas become staff-only; dobradinhas modeled via a `stateDeputy` entity.
- Camaçari consolidated to a single município (ZE 170/171 aggregated);
Salvador keeps its 19 zone municípios.
- Map moves to the staff dashboard; `/campanha/municipios` is list/overview.
- Vote pledges keep the declared vs estimated (scenario) asymmetry; leaders
never see estimates.
Destructive migration for the campaign vertical (drops nucleus/plaza-era
tables, wipes campaign rows, seeds 435 municípios). Public-site data untouched.
Includes the post-delivery /simplify cleanups: shared reloadStaffActor /
reloadCoordinatorActor helpers, req.context cache for getFreshCampaignUser,
parallelized dashboard loads, candidate dashboard-copy fix, and dead
leader-dashboard / roleKind code removal.
Capture field evidence from the anchor session, update CUSTOMER/roadmap plans, and add vote-scenario and internal WhatsApp bridge specs with interview audio and transcripts.
Enables @payloadcms/plugin-import-export on signature (flattened contact/petition columns) and contact (native fields) so operations can download filtered lists for external ESP/SMS workflows.
Embeds approved literature→persona→interview research in docs/research/, adds inteligencia-campanha master plan with child specs, updates roadmap/PRODUCT/AGENTS, and extends roadmap skills with data-presentation guidance.
Unify list and /editar server actions in plazaStaffFormActions.ts so B9 inline edits and the edit page share one implementation without behavior changes.
Ship static zone-to-neighborhood mapping for Salvador/Camaçari Praças-zona, overview UI card, tests/fixture, and roadmap/plan updates including F2 prep follow-ups from capture-review-debts.
Keep GeoJSON stable across metric/scale/hover changes via pathByKeyRef and O(2) restyle; extract bahiaMapStyle helpers with unit tests and close B10/B11 perf debt refs in plans.
Promotes the deferred B7 fitBounds follow-up into its own roadmap item and plan so the map can zoom to the filtered region without re-zooming on year/scale changes.
Deduplicate pledge aggregation via loadPlazaListPageBundle, add plazaRevalidation with slug-scoped detail paths after inline saves, and document the fill-in as shipped.
Adds valid-votes denominators to the map bundle, a Total vs % dos válidos selector with fixed 0–100% coloring, and readout/legend alignment via scaleMax; updates roadmap and post-simplify debt docs.
Adds polygon highlight, vote readout, and navigation (desktop click / mobile 2nd tap) on the filtered Praças choropleth, with simplify cleanup and B6 plan updates for incremental setStyle.
Wire buildPlazaListWhere into loadPlazaMapBundle, export PlazaListSearchParams
from plazaUi, add integration tests, and mark B7 delivered in roadmap/docs.
Add staff-only expectedVotes with migration, edit flow, and expectedVotes ?? pledge fallback across map, overview, and dashboard; document delivery and the A9+ loader dedup fill-in on the roadmap.
Let marketing configure a numeric facebookPixelId per petition in Payload, fire PageView on load and Lead after a successful signature, and mark the roadmap item delivered with deferred follow-ups documented.
436 seeded Praças (municipality-based; per-TSE-zone in Salvador/Camaçari) become
the operational unit; roles renamed to coordinator/advisor/leader with advisors
scoped to administered Praças. Leadership is one record per person across many
Praças/organizations; vote pledges split leader-declared vs staff-estimated
(estimates never serialized to leaders). Adds organizations, demand workflow
with staff-only cost/receipts, action-plan results with deputy presence, manual
political trend, multi-candidate comparison and the diverging red/white/blue
map mode. Migration 20260721_020109_remodel_plazas deliberately resets the
campaign vertical in production (public site untouched); test suite ported to
the new model (unit 187 / int 306 / e2e 9 green).
Surface brancos/nulos/abstenções as mobilization opportunity on nucleus detail and list overview, with loader aggregate and unit tests; register pending int coverage in escala-dry-pos-e2.
Extract dashboard cards into focused components (queues, upcoming plans, leadership status, recently visited, choropleth legend), compile the roadmap for outcome-oriented tracking, document the customer job and improve-app journey, and tighten roadmap skills with decision-quality gates.
Fix header alignment and rhythm, swap Megaphone for CampaignLogo, add progressive disclosure for first access, and extract shared auth shells with corrected individual-account copy; record closed critique items in RS+.
Classify nuclei as defesa/ataque/indecisa/perdida from 2022 baseline share, surface Alert + overview distribution, and register post-simplify follow-ups in A7/E7 plans.
Surface majoritarian base conversion and proportional flip opportunity on nucleus detail and list overview, precompute ticketFlip on the baseline VM, and register post-simplify scale debts in A7 F5 and E7.
Replace full Local API federal T1 loads with drizzle GROUP BY on nucleus detail, gate election reads via assertCanReadElectionData, and absorb post-simplify cleanup into the A7 plan and roadmap.
Add integration coverage for loadNucleusListElectionOverview (gap, trend,
conversion), extend TSE fixtures for multi-year seeding, register E7 Fase 4
test-helper debts on the roadmap, and simplify seed-consent exit handling.
Expand the compiled next-steps doc back into the full delivery history, cross-reference plan statuses, and sync AGENTS.md, PRODUCT.md, and the Núcleos project notebook.
Surface taxa de conversão on nucleus detail and list overview, with loader
optimizations and unit tests; update plan/roadmap follow-ups for E7, A7, and RS+.
Align the campaign desk with quieter KPI strips, queues-first dashboard, shared shells, and advanced filters; capture Impeccable design context and the remaining simplify/critique debts on the roadmap.
Deliver self-service forgot/reset via Resend, logged-in password change, and optional avatar on /campanha/perfil; register post-simplify engineering debts as RS+.
Absorb the virada insight into insight-alavancagem-chapa (winner or right-share triggers), align dobradinha taxonomy with electionPartySpectrum, and update roadmap and project notebook.