OPS61 — Forgejo: contracts de merge/flip quebrados — labels não flipam (GITHUB_TOKEN 403) e branch protection de main não reportada #53

Closed
opened 2026-08-18 15:23:50 +00:00 by fsolla · 3 comments
Owner
id depends serializes priority
OPS61
OPS57
P2

Plano: docs/plans/ops61-forgejo-contratos-merge-labels-e-branch-protection.md

--- id: OPS61 depends: [OPS57] serializes: [] priority: P2 --- Plano: [`docs/plans/ops61-forgejo-contratos-merge-labels-e-branch-protection.md`](docs/plans/ops61-forgejo-contratos-merge-labels-e-branch-protection.md)
fsolla added the
blocked
kind:chore
prio:P2
labels 2026-08-18 15:23:50 +00:00
fsolla added
ready
and removed
blocked
labels 2026-08-18 15:39:41 +00:00
Author
Owner

Promovido a ready: plano de intenção em main (ciclo OPS17 — pnpm agent:ready).

Promovido a `ready`: plano de intenção em `main` (ciclo OPS17 — `pnpm agent:ready`).
fsolla added
in-progress
and removed
ready
labels 2026-08-18 19:12:52 +00:00
Author
Owner

Claimed by agent run at 2026-08-18T19:12:52.990Z. Lock otimista: outro claim deve falhar e re-rodar pnpm agent:claim.

Claimed by agent run at 2026-08-18T19:12:52.990Z. Lock otimista: outro claim deve falhar e re-rodar `pnpm agent:claim`.
fsolla added
done
in-prod
and removed
in-progress
labels 2026-08-18 21:35:44 +00:00
Author
Owner

Merged em main via PR #67 — done + in-prod. Deploy de produção segue o verificador ci.yml (gated).

Merged em main via PR #67 — `done` + `in-prod`. Deploy de produção segue o verificador `ci.yml` (gated).
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: fsolla/teqo#53
No description provided.