teqo/docs
Francisco Ignácio Fontoura Solla 0109570b62 B65: anchor Início search and action strip to the mobile bottom.
The B46 flex spacer never filled the scrollport because min-h-full did not propagate; h-full min-h-0 plus home-dock groups the thumb zone above bottom nav.
2026-07-29 22:35:44 -03:00
..
design-refs Version UX Pilot design refs and map them to roadmap plans 2026-07-18 16:36:09 -03:00
plans B65: anchor Início search and action strip to the mobile bottom. 2026-07-29 22:35:44 -03:00
research Add emendas parliamentary-amendments discovery cycle (ciclo 3): 4-axis compendium, four synthetic personas, two-round interviews with cross-examination, consolidated report (kernel, 12 ranked pains, OST mapped to /mandato-/campanha-/comunicacao, anti-goals, 14 bets), and the real-interview script for the gabinete's planilha keeper. 2026-07-28 18:05:35 -03:00
ARCHITECTURE.md Engineering Pass 3: consolidate patterns and lock them with guards. 2026-07-29 06:11:29 -03:00
IMPROVE-APP-PLAN.md Document CG observed-use session and draft action-first home flows. 2026-07-29 13:14:57 -03:00
IMPROVE-CODE-QUALITY-PLAN.md Engineering Pass 3: consolidate patterns and lock them with guards. 2026-07-29 06:11:29 -03:00
roadmap.md B65: anchor Início search and action strip to the mobile bottom. 2026-07-29 22:35:44 -03:00
TECH-DEBT.md Engineering Pass 3: consolidate patterns and lock them with guards. 2026-07-29 06:11:29 -03:00
TESTING.md Engineering Pass 3: consolidate patterns and lock them with guards. 2026-07-29 06:11:29 -03:00