- ci-pr.yml: split the serial checks job into parallel lint/format/ typecheck/knip/cycles + unit/int (vitest --changed vs PR base via scripts/test-affected.mjs, full fallback on high-risk paths) + e2e (manifest path->spec via scripts/e2e-affected.mjs, blocking) + build; migration-lock gains checkout + pull-requests:read (fixes the failures that blocked PR #50) - ci.yml (main): full safety net — seed:minimal + int full + build + e2e - package.json: gate:fast / gate:push; .husky/pre-push runs gate:push - docs: "Dono do PR, dono do CI" policy in AGENT-OPS + work-issue + engineering-standards; changelog entry; plans for OPS3-OPS7 |
||
|---|---|---|
| .. | ||
| e2e | ||
| fixtures | ||
| helpers | ||
| int | ||
| unit | ||