teqo-backup/docs/roadmap.md
Francisco Ignácio Fontoura Solla 9fdbae05d7 Add C6 scale/DRY for supporters: bulk import, KPI aggregate, shared shells.
Phase 1 UX: StrictCombobox municipality in SupporterForm, AlertDialog in
RemoveSupporterDataButton. Phase 2 DRY: campaignListUrl + CampaignListPagination
+ campaignFormFields + mapCampaignFormActionError shared across nuclei,
supporters and action plans. Phase 3: single SQL aggregate for supporter list
KPIs via drizzle in the Payload txn. Phase 4: bulk drizzle insert for CSV import
inside the existing Payload txn with ON CONFLICT DO NOTHING, plus a fail-closed
skipContactPhoneInvariant context flag. Phase 5: HMAC-signed single-use import
token backed by a new supporterImportBatch staging collection so the full ok-row
set never crosses the Server Action boundary twice.
2026-07-18 22:17:31 -03:00

284 lines
41 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Roadmap — Teqo
Atualizado em: 2026-07-19 (MVP + Ciclo 2 deployados; A2 entregue; C2 engenharia pronta e mesclada em `main`; C3 Planos de Ação implementado e mesclado em `main`; C6 Escala e DRY pós-C2 implementado (Fases 1–5) — aguarda deploy; C7 registrado — escala/DRY pós-C3; B2 fundação de geometrias do mapa entregue; B5 registrado — escala/DRY pós-B2 do `/simplify`)
Registro canônico no repositório dos planos futuros e débitos conhecidos. Status operacional do ciclo atual de Núcleos fica em [`.cursor/rules/projects/nucleos-eleitorais.mdc`](../.cursor/rules/projects/nucleos-eleitorais.mdc); este arquivo lista o que ainda é futuro ou bloqueador, **em ordem de execução**, com dependências e paralelismo explícitos.
## Âncoras do calendário eleitoral 2026 (Res. TSE 23.760/2026)
| Data | Marco | Consequência para o produto |
| ----------- | ----------------------------------------------- | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| 20/07–05/08 | Convenções partidárias | Estrutura de núcleos/coordenadores deve estar operando **agora** |
| 15/08 | Prazo final de registro de candidaturas | TSE publica candidaturas 2026 na sequência → destrava o insight de dobradinha |
| 16/08 | Início da propaganda eleitoral (rua e internet) | "Quem chega em 16/08 com base de dados estruturada tem vantagem operacional" (Politipédia) — base nominal, baseline e agenda precisam estar em produção **antes** desta data |
| 09–23/10 | Propaganda gratuita rádio/TV | Reta final; congelar mudanças arriscadas no app |
| 04/10 | 1º turno | Operação do dia D (GOTV) — confirmação de comparecimento da base nominal |
| 25/10 | Eventual 2º turno | Chapa majoritária (Lula/Jerônimo); Solla decidido no 1º turno |
## Princípios e decisões travadas
- Priorizar ownership de audiência e portabilidade de dados. _(README)_
- Manter módulos genéricos o bastante para reuso em outros contextos políticos. _(README)_
- Default seguro e com controle de acesso para equipes de campanha e institucionais. _(README)_
- Um único app Next.js com três áreas: site público `(frontend)`, admin Payload `(payload)`, ferramenta interna `(campaign)` em `/campanha`. Sem serviço Rust separado. _(AGENTS.md)_
- Hospedagem na Vercel por enquanto; sem migração self-host/Coolify em andamento. _(AGENTS.md)_
- Doações **não** entram neste app — só CTA/link para QueroApoiar (`apoiar.me/jorgesolla`, homologado TSE). _(AGENTS.md)_
- Pessoa = `Contact` + collections de junção; nunca criar cadastro paralelo de "apoiador/pessoa". _(AGENTS.md)_
- Núcleo Eleitoral é unidade operacional da campanha; Zona TSE é referência oficial distinta. _(notebook Núcleos)_
- Sem disparo em massa por WhatsApp: vedado pela Res. TSE 23.610 (art. 33) e pela política da Meta; mobilização é orgânica (kits de compartilhamento individuais). _(plano cadastro-nominal, pesquisa 2026-07-17)_
## Onda 0 — Caminho crítico para `/campanha` em produção
O MVP de Núcleos está **entregue e deployado** (ondas 1–8 + refactors; 2026-07-18), junto com A1 (território multi-município/bairro), A2 (zonas TSE + sugestões cruzadas — sem migration), A3 (baseline TSE 2022 — modelo + import), B1 (overview da lista), C1 (compartilhar página), C3 (planos de ação / agenda) e D1 (PWA). C2 (cadastro nominal de apoiadores) tem a engenharia pronta e mesclada em `main`, mas segue bloqueada em produção pelo lote jurídico (Consent keys). As migrations (`20260718_010733_consolidate_campaign_schema`, `20260718_190559_territorio_multi_municipio_bairro`, `20260718_195854_add_election_results`, `20260718_222656_add_supporter`, `20260718_222832_add_action_plan`) aplicam automaticamente no `pnpm build` da Vercel. O que ainda separa a vertical de uso operacional com dados reais é jurídico + smoke pós-deploy:
1. **Lote jurídico único de LGPD/Consent** _(externo — assessoria jurídica eleitoral; é o caminho crítico da vertical inteira)_. Uma única rodada cobrindo:
- Base do art. 11 da LGPD + texto versionado de `Consent.key = 'lideranca-autopreenchimento'` (bloqueador do MVP de Núcleos; o app falha fechado sem a chave).
- Textos de `apoiador-cadastro` e `apoiador-intencao-voto` (bloqueadores do cadastro nominal — [detalhes](plans/cadastro-nominal-apoiadores.md)).
- Texto de `campanha-notificacoes-push` (opt-in de push — [detalhes](plans/notifications.md)).
- **Aviso de Privacidade / política de privacidade institucional** (obrigação do controlador antes de coleta em massa; também é item do site público).
- Avaliação de necessidade de RIPD (tratamento em larga escala + dado sensível).
- Racional: fatiar em rodadas separadas multiplica o lead time externo; quatro textos + aviso numa rodada só.
2. **Smoke pós-deploy** _(após o build Vercel aplicar a migration)_: conferir `NEXT_PUBLIC_SITE_URL` HTTPS exato, login `/campanha`, criar núcleo de teste, e só então cadastrar o Consent de liderança. Checklist completo no AGENTS.md.
3. **Ativação com dados reais assim que (1) liberar a chave de liderança.** (A decisão de 2026-07-17 de não esperar a migração multi-município ficou superada: A1 foi entregue e deployado antes da ativação — coordenadores já estruturam núcleos reais durante as convenções, 20/07–05/08, com o território definitivo.)
4. **Onboarding do time real** (usuários `geral`/`coordenador`, primeiros núcleos, treinamento básico de campo).
## Campanha (`/campanha`)
### Ciclo 1 — Núcleos (entregue)
MVP de território + reporte implementado e enviado (ondas 1–8 + refactors de composição/infra/fixtures): auth isolada `campaignUser` (`geral` / `coordenador` / `lideranca`), núcleos com slug canônico, designação de coordenador, lideranças, estimativas sugerir/confirmar com versão UUID, atualizações semanais, convites WhatsApp (`wa.me`, hash, uso único), dashboard e hardening. Detalhes: [`.cursor/rules/projects/nucleos-eleitorais.mdc`](../.cursor/rules/projects/nucleos-eleitorais.mdc).
### Ciclo 2 — entregues em 2026-07-18 (mesclados e deployados)
- **A1 Território multi-município/bairro** — `regions`/`cities`/`neighborhoods` viram arrays `hasMany` com backfill (`20260718_190559_territorio_multi_municipio_bairro`); bairros exigem município único; regiões derivadas no servidor. [Plano](plans/territorio-multi-municipio-bairro.md).
- **A3 Baseline TSE 2022 — Fase 1** — collections `electionTally`/`electionCandidateVote`/`electionCandidate` (grupo admin `Dados Eleitorais`), migration `20260718_195854_add_election_results`, import local `pnpm db:seed:tse` idempotente por escopo (year, office, turn). Sem UI ainda — a UI é A4. [Plano](plans/baseline-eleitoral-tse.md).
- **B1 Overview da lista de núcleos** — painel agregado (estimativa de votos, cobertura, últimas atualizações) entre filtros e lista, reagindo aos mesmos filtros da URL, com escopo por papel. [Plano](plans/overview-lista-nucleos.md).
- **C1 Compartilhar página** — diálogo no detalhe do núcleo com destinatários WhatsApp (coordenação geral, coordenadores, lideranças engajadas) + copiar link; envia só o link, não concede acesso. [Plano](plans/compartilhar-pagina.md).
- **D1 PWA `/campanha`** — manifest + service worker escopados em `/campanha`, shell offline, toast de instalação (Android/iOS) e limpeza de cache no logout; fundação do push (D2). [Plano](plans/pwa-campanha.md).
### Ciclo 2+ — A2 entregue e mesclado em `main` (2026-07-18)
- **A2 Zonas TSE + sugestões cruzadas** — cadastro estático `bahiaTseZones` (TSE 2024 `detalhe_votacao_munzona` BA, 417 municípios), motor puro `territorySuggestions` (inclui `outsideZones`), coordenador `NucleusTerritoryAndZonesFields` com chips `{rótulo} +` opt-in (município/TI → ZEs; irmãos do TI e cidades da ZE → Municípios), `TseZoneInput` controlado. Sem migration, sem igualdade forçada no save. [Plano](plans/zonas-por-municipio.md).
### Ciclo 2+ — B2 fundação de geometrias do mapa (2026-07-18)
- **B2 Mapa Fase 1 (geometrias)** — TopoJSON estático de municípios IBGE (`bahia-municipalities.topo.json`) + Territórios de Identidade por dissolução (`bahia-identity-territories.topo.json`), tabela `bahiaMunicipalityCodes` (nome canônico → `codarea`), helpers `bahiaGeometries` (`getMunicipalityFeature` / `getTerritoryFeature`), script re-executável `pnpm build:geometries`. Sem migration, sem UI (Leaflet = B3). [Plano](plans/mapa-bahia-geometrias.md).
- **B5 Escala e DRY pós-B2 registrado (2026-07-18)** — débitos do `/simplify` que não entraram no cleanup: lazy load de geometrias (split mun/TI + dynamic import, preferencialmente com B3) e helper compartilhado de cache CLI (`ensureCachedDownload` para `build:geometries` / `db:seed:tse`). [Plano](plans/escala-dry-pos-b2.md).
### Ciclo 2+ — C2 e C3 mesclados em `main` (2026-07-18)
- **C2 Cadastro nominal de apoiadores** — collection `supporter` (join `Contact`↔campanha, núcleo opcional), migration `20260718_222656_add_supporter` com `UNIQUE NULLS NOT DISTINCT (contact_id, nucleus_id)`, consent por chaves estáveis `apoiador-cadastro` / `apoiador-intencao-voto` via `campaignConsent.ts` genérico (`getConsentByKey` / `requireConsentByKey`, falha fechada), actions (create / intenção de voto / import CSV só `geral` / `removeSupporterData`), UI `/campanha/apoiadores` (lista+KPIs, ficha, wizard de import, kit mínimo `wa.me`). Telefone obrigatório no v1; `lideranca` sem acesso à área. Engenharia pronta e mesclada — produção com dados reais espera deploy (build Vercel aplica a migration) + Consent keys + aprovação jurídica (Onda 0). [Plano](plans/cadastro-nominal-apoiadores.md).
- **C3 Eventos / agenda de mobilização** — collection `actionPlan` + vertical `/campanha/planos` (lista com tabs Próximos/Todos/Realizados/Rascunhos, detalhe com tabs Visão geral/Tarefas/Atualizações, forms novo/editar), blocos "Próximos eventos" no overview de núcleos e no dashboard; `startAt` opcional só em rascunho (obrigatório ao sair de `rascunho`); access por `coordinators`/`leadership` (escopo `lideranca` só toggle `tasks.done` + append `updates`); transações via `withPayloadTransaction`; migration `20260718_222832_add_action_plan`. Sem `Consent` (dado interno de staff). [Plano](plans/eventos-agenda-mobilizacao.md).
### Referências de design (UX Pilot, 2026-07-18)
Os designs gerados pelo UX Pilot para os próximos ciclos estão em [`docs/design-refs/latest/`](design-refs/latest/) (pares `.png` + `.html` com o mesmo nome). **A UX/estrutura é a referência a seguir; a paleta não é** — os arquivos usam a paleta antiga (vermelho escuro `#8E0E23`, navy `#1B2B4B`, dourado `#C8874B`); toda implementação usa os tokens claros do tema `data-theme='campaign'` (`src/app/(frontend)/styles.css`: fundo branco, primário `#C51414`, superfícies neutras). Cada plano detalha o uso na sua seção "Referência visual (UX Pilot)".
| Item do roadmap | Design | Plano com instruções |
| ------------------------------------- | -------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| B1 Overview da lista de núcleos | `Lista-Nucleos-Overview` | [overview-lista-nucleos.md](plans/overview-lista-nucleos.md) |
| C1 Compartilhar página | `Compartilhar-Nucleo` | [compartilhar-pagina.md](plans/compartilhar-pagina.md) |
| A1 Território multi-município/bairro | `Formulario-Territorio` (bloco Território) | [territorio-multi-municipio-bairro.md](plans/territorio-multi-municipio-bairro.md) |
| A2 Zonas TSE + sugestões cruzadas | `Formulario-Territorio` (seção Zonas TSE + chips `{rótulo} +`) | [zonas-por-municipio.md](plans/zonas-por-municipio.md) |
| A3/A4 Baseline TSE 2022 + Gap vs 2022 | `Baseline-Eleitoral-2022` (+ bloco "Baseline 2022" em `Lista-Nucleos-Overview`) | [baseline-eleitoral-tse.md](plans/baseline-eleitoral-tse.md) |
| A5 Insights (5 planos) | `Baseline-Eleitoral-2022` (card "Insights do território", uma linha por insight) | [conversão](plans/insight-taxa-conversao.md) · [classificação](plans/insight-classificacao-territorial.md) · [alavancagem](plans/insight-alavancagem-chapa.md) · [mobilização](plans/insight-mobilizacao-brancos-nulos.md) · [competitiva](plans/insight-inteligencia-competitiva.md) |
| C2 Cadastro nominal de apoiadores | `Apoiadores-Lista`, `Apoiador-Ficha`, `Importar-CSV-Apoiadores` | [cadastro-nominal-apoiadores.md](plans/cadastro-nominal-apoiadores.md) |
| C6 Escala e DRY pós-C2 | — (sem design novo; reusa os de C2 + padrões de núcleos) | [escala-dry-pos-c2.md](plans/escala-dry-pos-c2.md) |
| C3 Eventos / agenda de mobilização | `Planos-de-Acao`, `Novo-Plano-de-Acao` | [eventos-agenda-mobilizacao.md](plans/eventos-agenda-mobilizacao.md) |
| C7 Escala e DRY pós-C3 | — (sem design novo; reusa os de C3 + padrões de núcleos/C6) | [escala-dry-pos-c3.md](plans/escala-dry-pos-c3.md) |
| B5 Escala e DRY pós-B2 | — (sem design novo; reusa geometrias B2 + padrões de scripts CLI) | [escala-dry-pos-b2.md](plans/escala-dry-pos-b2.md) |
| D2 Notificações (sino) | `Notificacoes-PWA` (central de notificações) | [notifications.md](plans/notifications.md) |
| D1 PWA `/campanha` | `Notificacoes-PWA` (banner "Instale o app da campanha") | [pwa-campanha.md](plans/pwa-campanha.md) |
| C5 Operação dia D / GOTV | `Dia-D-GOTV` | sem plano ainda — o design é a primeira materialização do item (check-off de apoiadores por seção/zona, progresso "62% da base", filtro "Ainda não confirmados", estado "Sincronizado" offline-tolerante) |
**Sem design nesta leva** (encomendar na próxima rodada ou desenhar na implementação): A6 dobradinha 2026, B2/B3/B4 mapa da Bahia, C4 demandas, fill-ins (visitados recentemente, listas globais, reset de senha). O detalhe do plano de ação (tabs Visão geral/Tarefas/Atualizações) e a tela de opt-in de push também não vieram — os planos correspondentes indicam o padrão a seguir.
### Grafo de dependências
Setas cheias = dependência dura; tracejadas = dependência suave (melhora, não bloqueia).
```mermaid
flowchart TD
subgraph Onda0["Onda 0 — produção"]
JUR["Lote jurídico único<br/>(4 Consent keys + aviso privacidade)"]
DEPLOY["Checklist deploy + lançamento MVP"]
end
subgraph TrilhaA["Trilha A — dados eleitorais e território"]
A1["A1 Território multi-município/bairro<br/>(migration) ✓"]
A2["A2 Zonas TSE + sugestões cruzadas<br/>(chips opt-in território↔ZE) ✓"]
A3["A3 Baseline TSE 2022 — Fase 1<br/>(import, collections) ✓"]
A4["A4 Baseline no produto + Gap vs 2022<br/>(detalhe, overview)"]
A5["A5 Insights: conversão, classificação,<br/>alavancagem, mobilização, competitiva"]
A6["A6 Dobradinha 2026"]
end
subgraph TrilhaB["Trilha B — superfícies de coordenação"]
B1["B1 Overview da lista de núcleos ✓"]
B2["B2 Mapa Fase 1 (geometrias) ✓"]
B5["B5 Escala e DRY pós-B2<br/>(lazy geometrias / cache CLI)"]
B3["B3 Mapa Fase 2 (Leaflet nas superfícies)"]
B4["B4 Camada de zonas TSE no mapa"]
end
subgraph TrilhaC["Trilha C — operação de campo"]
C1["C1 Compartilhar página ✓"]
C2["C2 Cadastro nominal de apoiadores ✓"]
C6["C6 Escala e DRY pós-C2<br/>(import/listas/forms)"]
C3["C3 Eventos / agenda de mobilização ✓"]
C7["C7 Escala e DRY pós-C3<br/>(território/contato/leituras)"]
C4["C4 Demandas"]
C5["C5 Operação dia D / GOTV<br/>(proposto, a validar)"]
end
subgraph TrilhaD["Trilha D — plataforma e engajamento"]
D1["D1 PWA /campanha ✓"]
D2["D2 Notificações (push + sino)"]
end
A1 --> A2
A3 --> A4
B1 --> A4
A2 -.qualidade de tseZones.-> A4
A4 --> A5
A4 --> A6
TSE2026["TSE publica candidaturas 2026<br/>(externo, após 15/08)"] --> A6
B1 --> B3
B2 --> B3
B2 --> B5
B5 -.lazy geometrias.-> B3
A4 -.métricas do coroplético.-> B3
A2 --> B4
B3 --> B4
A1 --> C3
A1 --> C4
C3 --> C7
C3 -.relação actionPlan opcional.-> C4
C6 -.campaignListUrl.-> C7
JUR --> C2prod["C2 em produção<br/>(dados reais)"]
C2 --> C2prod
C2 --> C6
C2 --> C5
C6 -.escala da base.-> C5
D1 --> D2
JUR -.chave de push.-> D2
```
Itens sem seta de entrada (**paralelizáveis a qualquer momento**): fill-ins (visitados recentemente, listas globais, reset de senha, higiene PascalCase). **Entregues e mesclados em `main` em 2026-07-18** (✓ no grafo): A1, A2, A3, B1, B2, C1, C2, C3 e D1 — ver "Ciclo 2" e "Ciclo 2+" acima. C2 segue com produção bloqueada pelo lote jurídico (Onda 0: Consent keys `apoiador-cadastro` / `apoiador-intencao-voto` + aprovação). Destravados por eles: A4 (A2/A3 + B1 prontos), B3 (B1 ✓ + B2 ✓; suave: A4 para coroplético e B5 F1 para lazy load), B5 (após B2; preferencialmente com B3), C4 (A1 + C3 prontos), C6 (merge de C2 ✓), C7 (após C3; suave: C6 F2) e D2 push (D1 pronto; falta a chave jurídica).
### Sequência de execução por janela do calendário
**Janela 1 — agora → 05/08 (convenções): colocar a vertical em produção e consertar a fundação de dados.**
| Ordem | Item | Plano | Depende de | Paralelizável com |
| ----- | ---------------------------------------------------------------------------------------- | ------------------------------------------------------ | ------------------------------------- | ----------------- |
| 1 | Onda 0 (jurídico em lote + deploy + lançamento) | — | externo | tudo |
| 2 | A1 Território multi-município/bairro **(entregue 2026-07-18)** | [detalhes](plans/territorio-multi-municipio-bairro.md) | — | B1, C1, A3 |
| 3 | A2 Zonas TSE + sugestões cruzadas (chips opt-in território↔ZE) **(entregue 2026-07-18)** | [detalhes](plans/zonas-por-municipio.md) | A1 (nasce contra `cities[]`) | B1 ✓, C1 ✓, A3 ✓ |
| 4 | B1 Overview da lista de núcleos **(entregue 2026-07-18)** | [detalhes](plans/overview-lista-nucleos.md) | — | A1, A2, C1 |
| 5 | C1 Compartilhar página **(entregue 2026-07-18)** | [detalhes](plans/compartilhar-pagina.md) | — | tudo |
| 6 | A3 Baseline TSE 2022 — Fase 1 (import) **(entregue 2026-07-18)** | [detalhes](plans/baseline-eleitoral-tse.md) | — (dado público; sem bloqueador LGPD) | tudo |
**Janela 2 — 05/08 → 16/08 (pré-propaganda): base nominal + inteligência + agenda prontas para o arranque.**
| Ordem | Item | Plano | Depende de | Paralelizável com |
| ----- | ------------------------------------------------------------------------------------------------------------------------------- | ------------------------------------------------ | -------------------------------- | ----------------- |
| 7 | C2 Cadastro nominal de apoiadores _(engenharia pronta e mesclada em `main` 2026-07-18 — deploy + Consent keys ainda pendentes)_ | [detalhes](plans/cadastro-nominal-apoiadores.md) | produção: lote jurídico (Onda 0) | A4, C3, C6, C7 |
| 8 | C6 Escala e DRY pós-C2 (import em massa, KPI, shells compartilhados com núcleos) **(implementado 2026-07-19 — Fases 1–5; aguarda deploy)** | [detalhes](plans/escala-dry-pos-c2.md) | C2 (merge) | A4, C3, C7 |
| 9 | A4 Baseline no produto + insight Gap vs 2022 | [detalhes](plans/baseline-eleitoral-tse.md) | A3 + B1 (suave: A2) | C2, C3, C6, C7 |
| 10 | C3 Eventos / agenda de mobilização (`actionPlan`) **(implementado e mesclado em `main` 2026-07-18)** | [detalhes](plans/eventos-agenda-mobilizacao.md) | A1 | C2, A4, C6, C7 |
| 11 | C7 Escala e DRY pós-C3 (território/contato compostos, leituras por aba, RMW/índice) | [detalhes](plans/escala-dry-pos-c3.md) | C3 (suave: C6 F2) | A4, C6 |
**Janela 3 — 16/08 → set (campanha de rua): inteligência ampliada, visualização e engajamento.**
| Ordem | Item | Plano | Depende de | Paralelizável com |
| ----- | -------------------------------------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------- | ----------------- |
| 12 | A5 Insights derivados do baseline (5 itens, paralelizáveis entre si; conversão e classificação exigem limiares de produto) | [conversão](plans/insight-taxa-conversao.md) · [classificação](plans/insight-classificacao-territorial.md) · [alavancagem](plans/insight-alavancagem-chapa.md) · [mobilização](plans/insight-mobilizacao-brancos-nulos.md) · [competitiva](plans/insight-inteligencia-competitiva.md) | A4 | B3, B5, C4, D1 |
| 13 | B2 Mapa Fase 1 (geometrias) **(entregue 2026-07-18)** + B3 Leaflet nas superfícies | [detalhes](plans/mapa-bahia-geometrias.md) | B3 ← B1 ✓ + B2 ✓ (suave: A4 coroplético; B5 F1 lazy geometrias) | A5, B5, C4, D1 |
| 14 | B5 Escala e DRY pós-B2 (lazy geometrias + cache CLI) | [detalhes](plans/escala-dry-pos-b2.md) | B2 ✓ (F1 preferencialmente com B3) | A5, B3, C4, D1 |
| 15 | C4 Demandas | [detalhes](plans/demandas-campanha.md) | A1 (suave: C3 para a relação `actionPlan`) | A5, B3, B5, D1 |
| 16 | D1 PWA `/campanha` **(entregue antecipado em 2026-07-18)** | [detalhes](plans/pwa-campanha.md) | — | tudo |
| 17 | D2 Notificações (push + sino) — sino não depende do PWA; push sim | [detalhes](plans/notifications.md) | D1 ✓ (push) + chave `campanha-notificacoes-push` do lote jurídico | A5, B3, B5, C4 |
**Janela 4 — set → 04/10 (reta final): dobradinha, dia D e estabilização.**
| Ordem | Item | Plano | Depende de |
| ----- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------- | ---------------------------------------------------------------------------------------------- |
| 18 | A6 Insight dobradinha 2026 | [detalhes](plans/insight-dobradinha-2026.md) | A4 + TSE publicar candidaturas 2026 (externo, após 15/08) + taxonomia de alinhamento (produto) |
| 19 | B4 Camada de zonas TSE no mapa | ciclo seguinte do [plano do mapa](plans/mapa-bahia-geometrias.md) | A2 + B3 |
| 20 | C5 **Operação dia D / GOTV** _(item proposto nesta revisão — validar com produto)_: confirmação de comparecimento da base nominal em 04/10 (lista de apoiadores por núcleo/zona com marcação "confirmou que vai votar / votou", visão de cobertura para a coordenação). É o uso final da base construída em C2; a literatura de campanha trata a mobilização do dia como onde eleições apertadas se decidem. Sem plano ainda. | design: [`Dia-D-GOTV`](design-refs/latest/Dia-D-GOTV.png) | C2 (suave: C6 para escala da base) |
| 21 | Congelamento: a partir de ~20/09, só correção de bug e dados; nada de migration arriscada perto do dia D. | — | — |
**Fill-ins (qualquer janela, quando houver folga; nenhum bloqueia nada):**
- **Visitados recentemente** (client-side, `localStorage`). → [detalhes](plans/visitados-recentemente.md)
- **Listas globais** (lideranças, atualizações, territórios no nível raiz). _(plano MVP; sem plano detalhado ainda)_
- **Reset de senha self-service + foto de perfil** (UX adiada do ciclo 1). _(plano MVP)_
- **Higiene de código:** varredura PascalCase dos componentes legados. _(notebook Núcleos)_
**Cortes seguros se o prazo apertar** (nesta ordem): B4 camada de zonas, B5 F2 (cache CLI — duplicação pequena), B3 mapa Leaflet (preferir levar B5 F1 lazy load junto se B3 entrar), C4 demandas, D2 push (mantendo o sino), C6 fases 3–5 (import bulk / preview token / KPI — só se a base nominal permanecer pequena), C7 fases 4–5 (leituras/RMW/índice — só se a agenda permanecer pequena), fill-ins (D1 PWA já entregue, saiu da lista de cortes). Preferir manter C6 fases 1–2 e C7 fases 1–2 (DRY de UI) se houver folga. **Não cortáveis:** Onda 0 (jurídico/Consent), C2 cadastro de apoiadores, C3 eventos/agenda, A4 baseline + gap — são respectivamente o risco legal, a base de dados, a operação da propaganda e o instrumento de alocação de esforço.
### Itens consolidados/removidos nesta revisão (2026-07-17)
- **"Insight: Gap vs 2022" como item separado** — removido: é a Fase 4 do plano de [baseline TSE 2022](plans/baseline-eleitoral-tse.md) (item A4), não um item próprio.
- **"Import do cadastro oficial de zonas TSE e/ou polígonos GeoJSON"** — absorvido: o cadastro tabular é o plano [zonas-por-municipio](plans/zonas-por-municipio.md) (A2); os polígonos são a camada de zonas do [plano do mapa](plans/mapa-bahia-geometrias.md) (B4).
- **"Sugestões cruzadas no formulário de território"** (chips `{Município} +` / `{TI} +` em ZEs; irmãos do TI e cidades da ZE em Municípios) — absorvido em A2 na revisão 2026-07-18; substitui o auto-preenchimento forçado + read-only da versão 2026-07-17 do mesmo plano.
- **"Notificações WhatsApp Business API"** — movido para fora de escopo: a Meta veda o WhatsApp Business API para campanhas políticas no Brasil e a Res. TSE 23.610 (art. 33) veda disparo em massa (pesquisa em [cadastro-nominal-apoiadores.md](plans/cadastro-nominal-apoiadores.md)). Push + sino ([notifications.md](plans/notifications.md)) cobrem a necessidade.
- **"Previsão estatística de votos"** — mantido, mas explicitamente **fora do horizonte deste ciclo eleitoral**: sem dado acumulado suficiente antes de 04/10; o baseline TSE + estimativa manual + insights são o "mínimo honesto" (design-ux §4.5). Reavaliar pós-eleição.
- **Dependência baseline → zonas-por-municipio** — rebaixada de dura para suave: `citiesForTerritory` já existe e as rows de `electionTally` resolvem cidade↔zona (ver revisão nos planos).
## Bloqueadores atuais
| Item | Status | Fonte |
| ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | ----------------------------------- | --------------------------------------------------------------------------- |
| Lote jurídico único LGPD (4 textos de `Consent` + Aviso de Privacidade + avaliação de RIPD) — ver Onda 0. Código do MVP já em `main`; o app falha fechado sem as chaves | **caminho crítico; iniciar já** | notebook Núcleos; AGENTS checklist; planos cadastro-nominal e notifications |
| RBAC em `users` — todo usuário do admin Payload tem acesso total; necessário antes de abrir `/admin` a equipe maior. Nota: o import de apoiadores foi desenhado no `/campanha` justamente para não depender disso | pendente | AGENTS Known Gap #1 |
| Fluxos públicos ainda hardcodam ID de Consent (ex. `consent: 2` em `submitWhatsapp.ts`); migrar para chave estável como na campanha | pendente | AGENTS Known Gap #2; plano-arquitetura |
| Collection `Pages` inexistente; hero/copy da home ainda hardcoded — bio, propostas e páginas institucionais | pendente (não bloqueia `/campanha`) | AGENTS Known Gap #3 |
## Site público
**Já entregue:** sistema de notícias/publicações (`post`/`tag`), listagens e artigos, seed a partir de jorgesolla.com.br, cache com tag `posts`.
**Próximos** (não bloqueiam `/campanha`, exceto a política de privacidade, que entra no lote jurídico da Onda 0):
- Página de política de privacidade institucional (LGPD) — **prioridade alta**, sai do lote jurídico da Onda 0. _(plano-arquitetura §3.1)_
- Modelar e popular `Pages` para conteúdo institucional (biografia, mandato, propostas). _(AGENTS Known Gap #3; plano-arquitetura §3)_
- Tornar editáveis título/subtítulo (e demais textos) da home via global/`Pages`. _(AGENTS Known Gap #3)_
- Agenda pública e multimídia: preferir links oficiais (Câmara, YouTube, Flickr). _(plano-arquitetura §3.1)_
- Garantir superfície clara de CTA "Doar" → QueroApoiar. _(AGENTS.md; plano-arquitetura)_
- Migrar Consent dos fluxos públicos (WhatsApp, petições) para resolução por chave estável. _(AGENTS Known Gap #2)_
## Admin Payload
- Introduzir `roles` em `users` e access control real antes de ampliar quem entra em `/admin`. _(AGENTS Known Gap #1)_
- Seed reproduzível de documentos `Consent` resolvidos por chave (não por ID numérico). _(plano-arquitetura §2.3)_
## Plataforma white-label
- Fase 2 do README: multi-tenant, customização de marca/conteúdo por mandato, módulos compartilhados de comunicação e engajamento.
- **Depois da eleição** — monorepo e white-label deliberadamente fora de escopo até lá. _(README Phase 2; plano-arquitetura §6)_
## Fora de escopo (por enquanto)
- Serviço Rust (ou outro backend) separado para `/campanha`. _(AGENTS.md; plano-arquitetura)_
- Migração self-host / Coolify enquanto a Vercel atender. _(AGENTS.md)_
- Processamento de pagamentos ou doações dentro deste app. _(AGENTS.md)_
- Tratar Núcleo Eleitoral como sinônimo de Zona Eleitoral do TSE. _(notebook; plano MVP)_
- PWA do site público ou do `/admin` — só a vertical `/campanha` será instalável. _(decisão de produto 2026-07-17)_
- **PostGIS** até surgir necessidade de query espacial real; v1 do mapa usa TopoJSON estático versionado no repo. _(decisão de produto 2026-07-17)_
- **WhatsApp Business API** — vedado para campanhas políticas pela Meta e sem caminho legal para disparo em massa (Res. TSE 23.610 art. 33); superado por push + sino. _(revisão 2026-07-17)_
- **Disparo em massa de mensagens** em qualquer canal — mobilização é orgânica (kits de compartilhamento individuais, art. 33 §2º). _(plano cadastro-nominal)_
- Previsão estatística de votos neste ciclo eleitoral. _(revisão 2026-07-17; reavaliar pós-eleição)_
## Fontes
- [`AGENTS.md`](../AGENTS.md) — decisões travadas, Known Gaps, checklist de campanha
- [`.cursor/rules/projects/nucleos-eleitorais.mdc`](../.cursor/rules/projects/nucleos-eleitorais.mdc) — status e decisões do MVP de Núcleos
- [`README.md`](../README.md) — missão e direção de produto
- [`docs/plans/*.md`](plans/) — planos detalhados por item
- Plano Cursor `núcleos_eleitorais_mvp_*.plan.md` (fora do repo; workspace local)
- `plano-arquitetura-campanha-2026.md` e `design-ux-campanha.md` (Cowork / pasta irmã; fora do repo)
- Res. TSE 23.760/2026 (calendário eleitoral) — https://www.tse.jus.br/legislacao/compilada/res/2026/resolucao-no-23-760-de-2-de-marco-de-2026
- Res. TSE 23.610/2019 (propaganda; art. 33 — disparo em massa) e Lei 9.504/1997
- Politipédia AVM — planejamento de campanha, base de dados, territorialização, operação do dia da eleição — https://politipedia.wiki.br